Technical feasibility is no longer the primary barrier for mass timber construction. Engineers and builders have proven that tall, strong, and safe structures can be delivered with cross-laminated timber and related products. The real bottlenecks now lie in insurance premiums and building code adoption. Insurers price risk, and without long … [continued]
The post Mass Timber At Parity: Fixing Insurance & Code Bottlenecks appeared first on CleanTechnica.