The new plant is designed for an annual capacity of 500 MWh by 2026, with the potential to scale up to 1 GWh. With this expansion, Libattion aims to reduce dependency on raw material imports, strengthen Europe’s energy security through local production, and meet the growing demand for energy storage systems.