Renewable Vibes December 19, 2025 0 10 7.4 MWp Retrofit Project Successfully Completed The modules of the 7.4 MWp system, originally installed in 2010, were completely replaced and repositioned. Existing mounting profiles, generator junction boxes, and the AC-side installation were reused.